Knowledge

Notifications

Logout

Dashboard

Data Modelling

Projects

Assessments

Measures Modelling

RC Coordination

Retrofit Design

Installation

Project Handover

Trustmark

Audit

Project Logs

References

Help from Antony

Measures Modelling

RdSAP-based improvement modelling for IOE and MTP generation

Improvement Option Evaluation & Medium Term Plan

Model energy improvement measures using RdSAP assessment XML data. Generate IOE packages and MTP stages with calculated SAP scores, costs, and carbon savings.

RdSAP 10

PAS 2035

SHDF

Modelling Workflow

1

Import Assessment XML

Upload pre-assessment RdSAP XML from the property assessment. Extracts current SAP score, property details, and existing measures.

2

Recommended Measures

View all PAS improvement measures with installation costs, annual fuel savings, repayment periods, carbon effectiveness, and eligibility status.

3

Build IOE Package

Select measures to include in the Improvement Option Evaluation. Calculate combined SAP score, CO2 savings, and total installation cost.

4

Generate MTP Stages

Sequence measures into Medium Term Plan stages with dependent stages, saving projections, and stage durations.

Available Improvement Measures

Solar PV

Photovoltaic panel installation with generation savings

Coming Soon

Insulation

Loft, cavity wall, solid wall, and floor insulation

Coming Soon

Heating

Boiler upgrades, ASHP, GSHP, and heat recovery

Coming Soon

Ventilation

MEV, dMEV, MVHR systems and draught proofing

Coming Soon

Low Energy

LED lighting and low energy appliances

Coming Soon

Generated Outputs

Improvement Model Report

All PAS measures with Measure ID and installation costs

Annual fuel saving and repayment period for each measure

Carbon cost effectiveness and potential energy rating

Space heating demand, CO2 and lifetime projections

Eligibility status for current funding schemes

IOE Package Summary

Combined package installation cost and annual savings

Repayment period and carbon cost effectiveness

Potential energy rating after measures applied

Space heating demand reduction analysis

CO2 saving totals and package model type

MTP Stage Plan

Sequenced measures with dependent stage ordering

Per-stage cost and SAP saving projections

Stage duration estimates in weeks

Key event comments and milestone tracking

Final projected SAP score after all stages

SAP Reports for RC Documents

Pre-assessment RdSAP report with current ratings

Post-measure projected SAP calculations

SF52 IOE evaluation documentation

SF69 Medium Term Plan documentation

Supporting data for Trustmark lodgement

SAVA Integration

Measures modelling will pull RdSAP XML data from assessments to calculate improvement options. IOE and MTP packages will be generated with full SAP scoring, creating the documentation needed to complete RC coordination documents.

In Development

Built with Reflex